Scheider Electric – Longview ISD
Completed August 2024
At the Longview ISD Early Graduation Campus, RMC electricians and HVAC crews provided the upgrade to turn an existing building into a PC Lab for the students of LISD.
Johnson Controls-SFA Chillers
May – October 2024
RMC electricians performed the electrical scope of work for the upgrade of 6 water cooled chillers on the SFA campus ranging from 200 tons to 900 tons.
Egan Company – Hormel Smokehouse
Completed October 2023
The Egan Company out of Minnesota contacted RMC about utilizing RMC for the installation of a controls upgrade for all the smoke pits at the Hormel facility in Henderson, TX. RMC provided skilled electricians of multiple levels to complete the project on schedule.
Target Warehouse – Conveyor Controls Upgrade
Completed November 2022
RMC provided an electrical crew for Associated Electrical Contractor consisting of a foreman, journeymen and apprentices to for the installation of controls upgrades at the Target Distribution Center in Lindale, TX under the supervision of Associated Electrical Contractors out of Illinois.
Camp County Courthouse – Electrical Upgrade
Completed October 2018
RMC installed new service, panel and distribution to accommodate additional upgraded HVAC equipment throughout the historic, 3 story building in Pittsburg, TX.
Trane Battery Chargers
Completed in 2018
RMC installed multiple distribution panel and electrical distribution to accommodate dozens of new Forktruck battery charging stations throughout their facility.
Trane – Substation Replacements/Installs
Completed December 2016, 2017, 2018
RMC has completed multiple substation install/replacement projects for the Trane plant in Tyler, TX over the last few years. RMC installed (2) brand new Eaton 13500V/480V substation consisting of (2) HV switches, (2) transformers and (2) breaker units. After weeks of pre-fab work, we brought these new substation online in less 5 days on each one. At startup, all affected equipment came on-line as planned without even a single piece of equipment being out of phase.