"I am well pleased with all the work Robertson Mechanical Contractors has done for White Oak ISD."
Trane – Building 9 AHU Replacements
Completed December 2018
RMC and its subcontractors provided a turnkey MEP replacement of (4) large indoor AHUs within the manufacturing space of this facility. The work included equipment, ductwork, CHW piping, electrical upgrades, insulation, controls, structural modifications and fire protection modifications.
Tyler Junior College – Mechanical Room Upgrades
Completed June 2018
RMC completed retrofitted (8) mechanical rooms at TJC which included removal of abandoned equipment and installation of new booster pumps and VFDs.
Schneider Electric – White Oak ISD Mechanical Upgrades II
Completed April 2016
This project consisted of an energy upgrade performance contract in which we supplied all piping & electrical installation for chillers, cooling tower, pumps, RTUs, AHUs and control components. Electrical scope of work also included the complete replacement of a 480V/3ph switchgear.
UT Tyler Boiler Replacement
Completed January 2016
This project consisted of the piping and electrical work to replace an older Cleaver Brooks hot water boiler with (5) Lockinvar condensing style hot water boilers.
UT Tyler Chiller Addition
Completed October 2015
RMC provided piping and rigging services for the installation of a 500 ton chiller, 500 ton cooling tower and pumps.
TAC Controls- White Oak ISD Mechanical Upgrades
Completed March 2009
This project included all mechanical and electrical work associated with the replacement of (2) chillers, (2) HW boilers, (8) pumps and miscellaneous piping and control valves throughout the elementary school campus.
Trane Arkansas-St Michaels Chilled Water Upgrade
Completed September 2007
This project at St. Michaels Hospital in Texarkana consisted of all mechanical work for the installation of an 1800 ton chiller and an 1800 ton cooling tower.